Once a house is finished, nobody sees its foundation. Yet it decides whether walls crack, floors settle, and the house lasts for decades. Here is how we built it at Casa 160 in Rodanta, El Marqués, Querétaro.

It all starts with the soil

Compacted platform and foundation reinforcement at Casa 160 in Rodanta, El Marqués

Before drawing a single rebar, we commissioned a geotechnical soil study. It tells us what kind of ground lies beneath and how much weight it can carry. That information defines the foundation type; it is not chosen out of habit.

We then cut the natural ground and replaced it with tepetate, a local granular fill, spread and compacted in layers. The house rests on a firm, level platform, not on loose soil.

The foundation, step by step

Mat slab, grade beam and column reinforcement at Casa 160 in Rodanta

Casa 160 has a combined foundation designed by a structural engineer:

  • Mat slabs: a reinforced-concrete slab under the house that spreads the load over a large area, so the soil works evenly.

  • Grade beams: reinforced-concrete beams under the main walls. They stiffen the slab and carry loads from one point to another.

  • Footings: wider supports where the load concentrates.

Everything is built to the structural drawings: bar sizes, stirrup spacing and column anchorage. Nothing is done by eye.

Where the weight comes from

Columns anchored to the slab and Novaceramic clay brick walls at Casa 160

A house weighs far more than it seems. The load comes from the Novaceramic multi-perforated clay brick walls, the floor slabs, the roof and everyday use. That weight travels down through columns and beams to the foundation, which spreads it into the ground. That is why the columns are anchored into the slab from day one: they are the load path.

Cantilevers

At Casa 160, part of the upper floor extends beyond the ground floor. That is never improvised: the slab and beams carrying the cantilever are designed for that load, and the reinforcement is anchored back into the house so it performs safely.

Quality control

Grade beam reinforcement over a moisture barrier with embedded piping before the pour, Casa 160
  • We check the reinforcement against the drawings before pouring and set it on spacers (chairs), so the steel is fully wrapped in concrete and kept off the ground. During the pour, the mesh is lifted with a hook so it stays in position.

  • We lay plastic sheeting as a moisture barrier against the ground.

  • Water, drainage and electrical lines are embedded before the pour, so the slab is never broken afterwards.

  • We pour ready-mix concrete with a design strength of f’c = 250 kg/cm² (about 3,500 psi), straight from the truck. What does that mean? After 28 days of curing, every square centimeter of concrete withstands 250 kg of compression. Put another way: a 10 × 10 cm square of concrete, about the size of your palm, can carry 25 metric tons, the weight of more than 15 cars. Mexico City’s Technical Standards classify it as Class 1 structural concrete, the higher-performance grade for load-bearing elements.

  • Next comes curing: keeping the concrete moist during the first days so it reaches its strength.

At Balaya, we review before we build

At Balaya y Asociados we review the design and the structure before construction. That is how we protect your investment, starting with what you don't see.

And when the house is ready, kitchens and closets are made in our own workshop, Cocinas Balaya.

 
 
 

Comments


Tell us about your project

Thank you for contacting us. We will review your project information and get back to you shortly.

  • Instagram
  • Google Places
  • Facebook

©2026 Balaya | Design and construction · Querétaro · 446 100 0370

bottom of page