Many of the cracks that show up in a house after a few years aren't the walls' fault: they come from the soil. In much of Querétaro and El Marqués, beneath the surface layer there is high-plasticity clay. It's a black soil that swells when it gets wet and shrinks when it dries. If a house rests on top of it, that movement sooner or later reaches the floors and walls.
What we found when we excavated
On a recent project, the geotechnical study identified three layers, and the excavation confirmed them:
About 30 cm of surface fill mixed with debris.
Roughly one meter of black clay, with vertical shrinkage cracks. This is the layer the study required us to remove.
Below it, a firm brown silt, the right layer to support the house.

The color change in the excavation wall is very clear. The black layer is the one that should never stay under your house.
Mistakes to avoid
Building without a geotechnical (soil) study, or having one and not following it. The study tells you how deep the firm soil is and what must be removed. Keeping it in a drawer is the same as not having it.
Placing a thin layer of tepetate (compacted fill) over the clay and building on it. It's the most common shortcut and the cheapest at first. The clay is still there and still moving, only now with the house on top.
Backfilling with the same soil that was dug out, or compacting it by just driving the machine over it. Fill should be good-quality tepetate, placed in layers of 20 cm maximum, at the right moisture and compacted with vibratory equipment.
Not testing compaction. Every layer needs its lab test. Without tests there's no way to know whether the fill will hold.
Excavating next to neighboring buildings without protecting them. Before digging, document the condition of the adjacent properties. During the work, protect the exposed face and backfill against it as soon as possible.
Leaving the bottom of the excavation exposed to sun or rain for weeks. The soil cracks or softens and has to be prepared all over again.
This is what that mistake looks like in real life. On our excavation we went 1.20 m below the floor level of an existing building, down to the firm silt. The cut shows that the building rests on a tepetate platform placed over the black clay, which was left underneath. That is exactly the mistake to avoid: as moisture changes, the clay swells and shrinks, which can cause differential settlement, cracks in walls, floors and fences, sticking doors and windows, and dampness or cracks in the slab.

How we work at Balaya y Asociados
Before starting a project, we check that the soil study and the structural design say the same thing: foundation depth, foundation type and fill. During excavation we confirm on site that we reached the right layer, and we keep control of levels, volumes and compaction tests. It's work you can't see once the house is finished, but it's what keeps the house in good shape for years.